Newly built, 3-bedroom premium home with private garden
Price
HUF 275,000,000
Newly built, 3-bedroom premium home with private garden
HUF 275,000,000
4 Rooms
3 Bedrooms
2 Bathrooms
~115 m² Total surface
~100 m² Living area
~30 m² Terrace surface
Description
In District III, above GOBUDA Mall on Táborhegy, a ground floor apartment of 85 m² with a 30 m² terrace, a 164 m² private garden, a garage space, and storage is for sale in a three-apartment condominium being built on a 1150 m² plot.
The apartment has a practical layout: spacious living-dining-kitchen area (31 m²), three bedrooms, and two bathrooms. Thanks to the large glass surfaces, the interiors are bright and have a direct connection with the private landscaped garden equipped with diverse vegetation, lawn, and an irrigation system.
The building's clean, characterful design and premium cladding together give the building an exclusive appearance, representing durability and timelessness in the long run.
The technical content is modern and of high quality:
- Hofstadter type exterior windows and doors, blinds with electric control,
- Daikin air-to-water heat pump system with ceiling cooling and underfloor heating,
- room-by-room adjustable Wi-Fi, smart home-compatible thermostats,
- Pierre Smart System smart home control (heating, lighting, entry, shading upon request),
- electric car charging preparation, with 3x16A per apartment and H tariff (heat pump),
- alarm and camera system,
- remote-controlled garage and garden gate,
- energy-saving LED lighting in communal areas,
- Hörmann garage door,
- elegant, durable facade cladding.
In the four-car underground garage beneath the building, 1 parking space and a 4-5 m² storage room are to be purchased. The price is 30 million HUF.
Táborhegy's peaceful, green environment offers clean air and a true suburban atmosphere, while the city center is easily accessible by car. This home is a perfect choice for those who wish to enjoy modern comfort, smart solutions, and the proximity to nature in a quiet, family-friendly environment.
The property will be completed by the end of 2026.